|
SwitchingDate: 2015-10-07; view: 385. MPLS Unit 4 Part 1 (ex.1) DSL PBX PSTN PTT VoIP VSAT MPLS subscriber (ex. 2) Submarine Fibre local Local loop (ex. 3) infrastructure capacity data network Redundant Teledensity Copper lead times Average (К упр. 2) Обратить внимание на перевод словосочетаний (не для обязательного запоминания) cable landing point, microwave radio link, data network provider, poor fixed line infrastructure, the country's electricity utility, fiber backbone, local telephone exchanges, point to point microwave tower, switching equipment, copper fixed lines, copper twisted pair, lead time
Part2 (ex.5) Put in install Phase out Roll out Find out (ex.7) Twisted twisted copper pair PBX intercity To dig Intercity Traffic Dial Predominantly Range Extension To switch to Switchboard Part 3 (ex.9) to be up to smth a sat phone comms room to set up smb with CAT 5 cabling LAN hub Challenge To transmit To drill Proper Environment Connectivity Remote Location To extend Node Router Trench Premises Contractor To wire out Laptop Standalone Headset Despite Capability
Part 4 (output) To be faced with Advantage To cover Coverage Entire Bypass Impact To enable Area To be suited for Last mile access Performance To add Well-established To evolve To emerge To catch up To broaden Cellular Increasingly Core set Versus (vs) To compete To co-operate
|